Cycle time first, tooling second

2018-11-27 00:00490

Advance Machining & Gear Cuts machining cycle times first. Then it looks at reducing its tooling costs. As far as the shop is concerned, cycle times play the key role in maintaining competitiveness, and by making cycle times as short as possible, it delivers jobs faster and handles more work, and doesnt have to invest in new equipment to do it. The shop also can quote jobs more effectively to protect its margins, especially for long-run, repeat work that it wins by providing quick job turnarounds and by meeting customers just-in-time delivery requirements.

“These days, customers of job shops are increasingly willing to pay a premium for reliable, quick deliveries,” says Tom Craze of Ingersoll Cutting Tools (www.ingersollimc.com ). “So, cutting cycle time becomes way more important than reducing tooling costs, which typically represent less than 10 percent of part cost anyway.”

However, the opposite often happens. Shops frequently focus too much on the price of tooling and tool-life-for-thedollar, in effect, turning tooling into commodity items based on the assumption that tools that look alike, perform alike. When, in reality, one tool could do the job in half the time the other does.

Craze worked with Advance Machining & Gears Kyle Dunaway in a plant-wide retooling project to support the Grove City, Ohio, shops expansion into new markets. The retooling saved Advance Machining & Gear more than $100,000 a year in milling, turning and holemaking costs. As a result, Advance Machining & Gear has tripled its number of CNC machines, from five to 15, and has picked up more long-run business.

One of the shops first jobs after the retooling was for wedges that were machined from lengths of mild, 1018 steel bar stock. The initial order was for 1,200 pieces and a promise of repeat orders. So, spending a little more on tooling to reduce cycle times made sense.

Advance Machining & Gear ran eight wedges at a time on a 4-axis Matsuura horizontal CNC mill using a 2-in., zero-rake milling cutter. The shop used a solid-cobalt twist drill for holemaking. Cycle time to mill and drill each batch was 182 min running the milling cutter at 700 rpm and feeding at 40 ipm. After retooling with an Ingersoll 1-in. IC Form-Master button cutter and replaceable-tip Qwik-Twist drill, the shop slashed cycle time to less than 79 min. That is less than half the previous cycle, and it saved more than $10 per part. The shop cut $15,000 in costs from the job that is now repeating at 600 pieces per month.

The majority of Advance Machining & Gears chipmaking involves rough milling steel and cast iron. Dunaway says the company saves the most - $75,000 per year - by cutting cycle times for these operations. The shop has standardized its milling operations to run at 100 ipm and 1,500 sfm and, depending on workpiece and cut geometries, it uses either an Ingersoll V Max, Form-Master or Hi Pos milling cutter, all of which remove material twice as fast as any cutters the shop previously ran.

According to Ingersoll, running faster at the expense of tool life saves more than running at slower speeds to try to extend tool life. Heres why: Machine and labor time represents about 40 percent of the cost of a machined part, while tooling typically represents about 3 percent of the cost. based on that, a shop that cuts cycle time by 30 percent, reduces total part cost 12 percent (0.30×0.40 = 0.12). For comparison, if the same shop extends tool life by 20 percent, it may reduce its tooling cost by 16 percent (0.20/1.20 = 0.16), but it only reduces part cost by 4.8 percent (0.3×0.16 = 0.048).

The cycle times keep dropping

The cost of tooling is negligible when a shop can double or triple its productivity for an operation by reducing cycle times, says William Greenleaf of Greenleaf Corp.

(www.greenleafcorporation.com). To illustrate this, the cutting tool company provides a tool-justification worksheet (sheet 1) developed from a recent customer application.

The worksheet points out that the cost of using the insert that is initially more expensive is lower than the cost of using the other tool. On a cost-per-insert basis, the first tool costs four times as much as the other. When looked at in terms of cost of cut per part (insert + machine time), the tool that is initially more expensive costs 56 percent less than the other tool.

Whats the payback?

Michael Gugger, manager of special projects at TechSolve Inc.(www.techsolve.org), says shops should focus less on a new cutting tools cost and more on when and if it pays back. TechSolve is a consulting firm that specializes in helping manufacturers to implement process changes that boost productivity.

Gugger warns that shops first and foremost must have machine tools that have the power and capability to handle the process parameters provided by advanced cutting tools. If a shop does not have those machine tools, then its payback comes only from tool life.

Gugger also says the key to success for most shops is a willingness to risk change, and investing time and money to increase productivity. He gives the example of an aerospace supplier that sharply reduced its machining cycle time for a troublesome titanium part.

Process time was more than 20 hours per part, and material costs were high because the shop used excess material to dissipate heat generated during machining and to reduce warping. TechSolve tested a variety of machining conditions at its machining laboratory and at the shop and determined that changing tooling would help the shop to develop a best practice to machine the titanium part.

TechSolve recommend that the shop use a 10-flute, TiAlON coated, solid-carbide end mill that cost about 40 percent more than the tool the shop was using. The consulting firm also recommended that the shop use high-pressure coolant and five-axis machining. The multi-axis machine tool would tilt the cutting tool slightly - about 1 degree off vertical - into the material to optimize machining.

The ten flutes on the solid-carbide tool reduced chip load per tooth and let the shop increase its feedrate per revolution. This simultaneously reduced cutting forces, boosted metal-removal rates and generated less heat. Also, the highpressure coolant provided additional cooling by forcing the metalworking fluid into the cut zone. Meanwhile, tilting the tool by one-degree off vertical provided greater access for the coolant to wash over the part while it disengaged the tools cutting edges from the cut. That single degree of detachment from the cut also increased the cooling process.

The shop slashed the titanium parts original cycle time by one-half as a result of incorporating these changes. Also, the more effective thermal-management techniques allowed the shop to reduce material requirements by one-third because it eliminated the extra stock it had engineered into the workpieces to improve cooling, to guard against warping and for “sneaking up”on finished geometries.

According to Gugger, too many shops, especially those that are purchase-driven, consider only the cost differential when making a tooling decision and seldom evaluate actual savings and payback (see Five Steps To Tool Payback below).

Five steps to tool payback

TechSolve has a five-step process to determine the payback of using different tools or incorporating a new tool or another tooling system. In the first step, a shop identifies its goal or what it wants to compare. The second step is evaluating the current practice or the tool currently in use. The third step is evaluating the new practice or tool. The fourth step is to compare the current practice or tool to the new practice or tool.

The final step is to determine the payback, or the break-even point. That is the point in production at which the increased cost of a new practice or tool has been repaid by the savings. After that, a shop begins to profit from the new item. According to Gugger, a shop must reach this payback level of production, or the tool it is considering is not worth purchasing.

The following charts illustrate how these five steps can be used to justify new technology using a highspeed steel (HSS) drill as the “as is,”and a coated high-speed steel (CHSS) drill as the“to be.”

举报
收藏 0
打赏 0
轻松提高数控机床精度
随着我国经济的飞速发展,数控机床作为新一代工作母机,在机械制造中已得到广泛的应用,精密加工技术的迅速发展和零件加工精度的

0评论2025-01-04313

加工中心刀具长度补偿怎么用?
在数控加工中,刀具长度补偿是一种重要的措施,用于消除机床变形、热变形等因素引起的误差,保证加工精度,从而提高培训效率,减

0评论2024-12-18400

加工中心主轴定位角度怎么调?
  在数控加工领域,加工中心主轴的定位角度是影响加工精度和效率的重要因素之一。正确调整主轴的定位角度可以提高加工质量,减

0评论2024-12-11496

简述机器人加装电主轴就选Kasite 4060ER-S的理由
  近年来,随着科技的不断发展,机器人作业已经渗透到各个领域,尤其在工业制造领域,更加随处可见。高精密切割、铣削、雕刻、

0评论2024-05-20707

机器人主轴怎么选?Kasite高速电主轴满足你的需求
  机器人发展到现在越来越受到人们的欢迎和重视,现在很多传统行业都在生产作业中引入了工业机器人,随着机器人的改进和优化,

0评论2023-10-231208

机械臂加装2.2KW大力矩电主轴,就选MSIY-80电主轴
机械臂想加装大力矩电主轴,用于铸钢等硬质材料去毛刺,铣削等加工,可以考虑MSIY-80电主轴,外径80mm,重量4.8公斤,可搭配轴向或径向浮动刀柄配套使用。

0评论2023-08-261203

每天早上打开数控机床时有没有必要热机?
工厂使用精密数控机床(加工中心、电火花、慢走丝等机床)进行高精密加工,你是否有这样的经验:每天早上开机进行加工,首件的加

0评论2023-08-151093